Huitt-Zollars provided planning, project reports, environmental analysis, structural design and calculations, and final plans, specifications and estimates for the Lost Hills Road Interchange on US 101. The project included widening an existing two-lane bridge over Highway 101 to a new five-lane bridge with an expanded cloverleaf interchange, along with on- and off-ramps. Multiple alternative interchange configurations were analyzed, to develop the plan that provided adequate capacity while minimizing community impacts. Huitt-Zollars’ scope preparing construction plans for the project, included improvements to adjacent roadways.
B.E.S.T. (Building Excellence/Shaping Tomorrow) Award Winner for Traffic, Mobility & Beautification, Pop. less than 50,000 – presented to City of Calabasas, APWA Southern California Chapter (2018)