Huitt-Zollars developed a Stormwater Master Plan for Upper Turtle Creek Basin A within the City of University Park, Texas. The study area includes approximately 510 acres and drains into Turtle Creek. The master plan included analysis and assessment of existing storm drain system performance and provided proposed improvement recommendations. Proposed improvements included storm drain upgrades and incorporation of four detention systems to mitigate impacts to downstream properties. The study area is close to being fully developed; therefore, all detention systems were modeled as underground detention systems and strategically placed under City parks.
Stormwater Master Plan - Upper Turtle Creek Basin A
University Park
Client
City of University Park