Maneuver Systems Sustainment Center

The Maneuver Systems Sustainment Center (MSSC) is a $70 million new facility that achieves consolidation of multiple functions into a single 377,000-square-foot, seven-building facility on approximately 15 acres of site development. In addition to the design of the building and site, Huitt-Zollars was responsible for programming, layout, and design of approximately $20 million of highly specialized process-related equipment. Huitt-Zollars served as the prime design firm, with responsibility for management as well as technical responsibility for architecture, structure, mechanical (including both HVAC and piping/plumbing) and electrical engineering.

Maneuver Systems Sustainment Center
Red River Army Depot
Client
U.S. Army Corps of Engineers, Fort Worth District