Huitt-Zollars developed construction contract documents for rehabilitating an existing two-span box culvert bridge over Ralston Creek. The project included preparation of construction contract documents including structure plans, demolition plans, aesthetic bridge rail design, pavement replacement, curb and gutter, sidewalks, retaining walls, utility coordination, traffic control plan, erosion control plan, and obtaining a Nationwide 404 permit.
Miller Street Bridge Rehabilitation
Arvada
Client
City of Arvada