Falcon Field Airport Drainage Improvements

Huitt-Zollars provided civil engineering services to improve drainage facilities at Falcon Field Airport. The project included 700 linear feet of slotted drain; storm drain inlets; 15,000 linear feet of 18-inch to 48-inch storm drain along existing taxiways and existing roadways; and grading of a large drainage basin utilized to retain storm water runoff from the airport.

Falcon Field Airport Drainage Improvements
Mesa
Client
City of Mesa